Skip to main content

Free Concrete Calculator – Volume & Cement Bags

Concrete Calculator finds the volume of concrete needed for a slab in cubic metres, cubic feet, and yards, plus cement bags, online for free.

Written & reviewed by Helperzy Editorial Team · Updated July 2026

VolumeCement BagsCubic YardsInstantFree

Volume (cubic metres)

1.416

Volume (cubic feet)

50.00 ft³

Cement Bags (~50kg)

9 bags

Cubic Yards

1.85 yd³

100% Private

Runs locally. Nothing uploaded.

How to Use Concrete Calculator

1

Enter Dimensions

Type the length, width, and thickness of the slab or footing. Measure the prepared subgrade rather than the drawing, since a dip of an inch adds real volume.

2

Pick Thickness Unit

Choose inches or feet for the thickness value. Inches is usually easier for slabs, and the tool converts it internally before working out the volume.

3

View Volume

Read the volume in cubic metres, cubic feet, and cubic yards, plus the cement bag estimate. Order in whichever unit your supplier quotes, and add 5 to 10 per cent spare.

How the Concrete Calculator Estimates Volume and Cement Bags

Concrete is ordered by volume, not by area, and that trips up a lot of first-time pours. This calculator takes the length, width, and thickness of a slab, footing, or floor and returns the volume in cubic metres, cubic feet, and cubic yards, along with a rough count of 50 kg cement bags. Self-builders pouring a patio, homeowners laying a garage floor, and site supervisors placing a ready-mix order all need the figure before they can price the job or book a truck. Suppliers quote per cubic metre or per cubic yard depending on where you are, which is why all three units are shown together rather than one. The formula is volume = length × width × thickness, with every dimension in the same unit. Thickness is the odd one out because it is usually a few inches while the other two are in feet, so you enter it in inches and the tool divides by 12 before multiplying. Conversion then uses fixed factors: one cubic foot is 0.0283168 cubic metres, and one cubic yard is 27 cubic feet. The cement-bag estimate multiplies the cubic-metre volume by 6.34 bags per cubic metre, which is typical of an M20-grade structural mix, and rounds up. That bag figure is a planning number only, because cement content changes with the grade — M15 uses less, M25 more — and with whether you are hand-mixing or buying ready-mix. A worked pour: a 10 foot by 10 foot slab at 6 inches thick. Thickness becomes 6 ÷ 12 = 0.5 feet, so the volume is 10 × 10 × 0.5 = 50 cubic feet. That converts to 50 × 0.0283168 = 1.416 cubic metres, or 50 ÷ 27 = 1.85 cubic yards. At 6.34 bags per cubic metre the cement requirement is about 8.98 bags, rounded up to 9. Scale it to a driveway 20 feet by 10 feet at 5 inches: 83.33 cubic feet, 2.360 cubic metres, 3.09 cubic yards, and 15 bags of cement. The real jobs look like this. Someone laying a 12 by 10 foot garage floor at 4 inches gets 1.133 cubic metres and 8 bags, which is small enough to hand-mix over a weekend rather than paying a ready-mix minimum charge. A builder pouring four column footings each 2 by 2 feet by 1.5 feet deep calculates one footing at 6 cubic feet and multiplies by four for 24 cubic feet total. A homeowner comparing a ready-mix quote against buying cement, sand, and aggregate separately uses the cubic-metre figure to price both routes. And anyone booking a mixer truck needs the volume in the supplier's unit, since ordering 1.85 yards when you meant 1.85 metres leaves you nearly a third short. Most suppliers also apply a minimum load charge, so very small pours are often cheaper to hand-mix on site. The expensive mistake is under-ordering. Concrete has to be placed in one continuous pour; if you run out and mix a fresh batch an hour later you get a cold joint, a weak seam that can crack and leak for the life of the slab. Add roughly 5 to 10 per cent for spillage, uneven subgrade, and formwork that bows slightly under load. Also check your subgrade is level before measuring thickness, since a dip of even an inch across a large slab adds real volume. This tool sizes the pour and does not design the mix: cement, sand, aggregate, and water ratios for structural work must come from an engineer's approved specification, and reinforcement is a separate calculation entirely. Everything runs in your browser, so your project dimensions are never uploaded or stored.

Concrete Calculator Formula & Method

Volume = length × width × thickness (all in the same unit) length and width = plan dimensions of the slab or footing, in feet thickness = depth of the pour; entered in inches it is divided by 12 to give feet Cubic feet to cubic metres: multiply by 0.0283168 Cubic feet to cubic yards: divide by 27 Cement bags (50 kg) ≈ volume in cubic metres × 6.34, rounded up (typical M20-grade mix) Add 5–10% for spillage and an uneven subgrade. Bag count is a planning estimate, not a mix design.

Examples: Concrete Calculator

Input

Slab 10 ft × 10 ft, thickness 6 inches

Result

50 ft³ · 1.416 m³ · 1.85 yd³ · about 9 bags of 50 kg cement

Thickness 6 ÷ 12 = 0.5 ft, so 10 × 10 × 0.5 = 50 ft³. Then 50 × 0.0283168 = 1.416 m³, 50 ÷ 27 = 1.85 yd³, and 1.416 × 6.34 = 8.98 bags, rounded to 9.

Input

Driveway 20 ft × 10 ft, thickness 5 inches

Result

83.33 ft³ · 2.360 m³ · 3.09 yd³ · about 15 bags

20 × 10 × (5 ÷ 12) = 83.33 ft³, which is 2.360 m³ and 3.09 yd³; 2.360 × 6.34 = 14.96 bags, rounded up to 15.